Kneat: Project Ready

Kneat enables regulated companies to consolidate validation and quality management into a single end-to-end web-based software platform.

CAI’s Kneat: Project-Ready allows your company to utilize a validated Kneat instance to execute your projects without start-up and on-going maintenance. Project-Ready does the heavy lifting for you with pre-designed processes and templates.

Faster, Smarter Validation in under 2 weeks.


We originally looked at Kneat as our validation solution but didn’t have sufficient staff to manage our own implementation. Through Kneat: Project-Ready, we were able to utilize the benefits of Kneat and execute with our current team and fewer headaches.

– Aaron, Project Manager

Our Validated Kneat: Project Ready Templates

Commissioning and Qualification

Codified to deliver systems fit for intended use.

Commissioning and Qualification

  • Commissioning and Validation Master and Project Plans with common section templates like Commissioning Safety, RACI Chart, Project Change Management (7 total)
  • Project Change Management Log and Form
  • User Requirements Specification
  • Process and System Risk Assessment
  • Design Review Report
  • Verification Protocol with common templates for
    • Installation Verification like Receipt Verification, Drawing and P&ID Walkdown Verification, Control System Input/Output Verification (17 Total)
    • Operational Verification like Backup and Restore of Control System Verification, HEPA Filter Testing Verification, Water System Distribution Verification (13 Total)
    • Ability to integrate vendor testing performed in FAT, SAT and/or Vendor Protocols
  • Issues and Retest Forms
  • Project Summary Report

Building Commissioning

Integrated systematic tools to streamline the commissioning process.

Building Commissioning

  • Commissioning Plan
    • Pre-Function Checklists, Functional Test Protocols or Installation and Operational Verification Protocols for common systems like:
      •  Electrical
        • Lighting Control
        • UPS Electrical
        • Audio Visual
        • 9 Total
      • Mechanical
        • Mini Split/ACCU
        • Process Chillers (Air Cooled)
        • Steam Boilers
        • 21 Total
      • Plumbing
        • Potable Cold Water
        • Natural Gas
        • RODI
        • 11 Total
    • Field Reports
    • Commissioning Specifications
    • 10 Month Follow-Up Report
    • Commissioning Final Report

Computer Software Assurance (CSA) and Computer System Validation (CSV)

Risk-based framework tools and deliverables for Production and Quality software and automated data processing systems.

Computer Software Assurance (CSA) and Computer System Validation (CSV)

  • CSV/CSA Validation Plan
  • Computer System Assessment
  • Project Change Management Log and Form
  • Acceptance Test Protocol
  • Unscripted Test Protocol
  • Issues and Retest Form
  • Summary Report Form for Computerized Systems

Good Engineering Practices

Codified engineering practices for delivery of systems fit for intended use and enabling quality processes.

Good Engineering Practices

  • Commissioning Project Plan with common section templates like Commissioning Safety, RACI Chart, Project Change Management (7 total)
  • Project Change Management Log and Form
  • Design Review Report
  • Commissioning Protocol
  • Issues and Retest Forms
  • Project Summary Report